Precautions before the kitchen renovation are more convenient to arrange

In the early stage of kitchen decoration, the first intervention of the kitchen cabinet designer is very important. It is forbidden to consider the integrated kitchen cabinet design after the wall and the ground are all done.

First of all, according to your own living habits, explain your requirements to the designer as much as possible, such as the type of electrical appliances used in the kitchen, whether to install special equipment such as water softeners, audio, etc., which will involve the location of the waterway and circuit pre-wired. .

Secondly, the designer designs the combination of the cabinets according to your needs, the width and height, and the position of the stove, the basin and the hood.

Finally, the decoration workers pre-embed the water pipes and power sources according to the finalized layout plan, and reserve the corresponding exit positions.

There are many pipelines in the kitchen that are concealed. If you don't think about it in advance, a little leak will bring endless troubles to your future life and maintenance. The perfect fit will not only make your kitchen safe and orderly. It is also more convenient to get up.

Conventional electrical appliances:

Household appliances such as rice cookers, microwave ovens, and refrigerators in the kitchen are usually fixed in position. Therefore, according to the usage habits, the installation position is determined when designing the cabinet, so as to arrange the position of the power panel nearby.

Tip: The refrigerator should not be too close to the stove, because the stove generates heat and is a source of pollution, affecting the temperature inside the refrigerator; it should not be too close to the basin to avoid leakage of water from the refrigerator. In addition, the refrigerator should be placed 10 cm from the front to facilitate heat dissipation in the refrigerator, which is safe and energy-saving.

Additional appliances:

If you add embedded appliances such as disinfection cupboards and dishwashing cabinets, arrange water and electric pipes, and related plug and socket positions.

Special electrical appliances:

Nowadays, the kitchen space is more and more spacious. If your kitchen area is more than 15 square meters, it is necessary to reserve one air conditioning power cord. This is even more necessary if the kitchen is a space.

The water level of the faucet of the basin: If the faucet installed on the wall is selected, after determining the cabinet scheme, the faucet position should be delineated at the corresponding wall position. The water heater will pre-bury the hot and cold water pipe into the wall. If the faucet installed on the counter top or the basin is used, the water pipe should be embedded in the wall behind the basin cabinet. Water Purifier: At present, the model of the water softener on the market is too large. If you plan to purchase it, it is best to determine the required model before designing the kitchen cabinet, and arrange the position of the integrated kitchen with the designer (usually installed in the total At the water inlet). During the decoration, the hydraulics and electrician will cooperate with the designer to determine the connection position between the water pipe and the machine to ensure the convenient operation and away from the power supply, to avoid the hidden danger of short circuit. All the equipment is better hidden in the cabinet.

Tip: The installation of the water softener should be based on the convenience of future maintenance. There should be no object blocking in the cabinet, which must be easy to operate and view.

Do a waterproof treatment to prevent future problems: Don't neglect this project, otherwise you will leak water in your kitchen and soak the kitchen cabinet downstairs, but you will lose your wife and lose your troops. Generally, the house is waterproofed when it is in the main body of the building. However, when re-planning in the decoration stage, the pre-buried and removed wall of the water circuit pipeline will destroy the original waterproof layer, and the new partition wall needs to be re-waterproof.

After completing all the modifications, the newly repaired wall will be re-painted with a waterproof coating on the back waist, and the height of the painting should not be less than 1.2 meters. After the water-repellent agent has dried out, do a water-tight test: block all the drains in the kitchen, build a 25-cm-high “threshold” at the door, and then pour 20 cm of water into the kitchen. After 24 hours, check the surrounding walls. There is no leakage on the surface and the ground. Observe the water on the roof of the kitchen downstairs or condensation.

Turbine Flow Meter

Here you can find the related products in Turbine Flow Meter, we are professional manufacturer of Turbine Flow Meter,Turbine Meter,Turbine Type Flow Meter,Electronic Turbine Meter. We focused on international export product development, production and sales. We have improved quality control processes of Turbine Flow Meter to ensure each export qualified product.
If you want to know more about the products in Turbine Flow Meter, please click the product details to view parameters, models, pictures, prices and other information about Turbine Flow Meter,Turbine Meter,Turbine Type Flow Meter,Electronic Turbine Meter.
Whatever you are a group or individual, we will do our best to provide you with accurate and comprehensive message about Turbine Flow Meter!

Turbine Flow Meter,Turbine Meter,Turbine Type Flow Meter,Electronic Turbine Meter

Xi'an Gavin Electronic Technology Co., Ltd , https://www.gaimc-meas.com