Wooden door installation should be stuck: measurement time installation time

The production cycle of indoor wooden doors is long, and it takes at least 10 days. During the peak season, the production cycle may be extended. In addition, if the manufacturer of the wooden door is in the field, then the transportation time is added. In this way, it takes a month or so for a wooden door to go from purchase to measurement to installation. Therefore, the professional reminds the owner that in order not to affect the progress of the decoration, the wooden door should be ordered as soon as possible. Install the wooden door should be stuck at two points in time to avoid delays.

1 measurement time

Wooden doors are custom-made products. Because the owner's living room conditions and their requirements for the style and color of the wooden doors are different, they must be measured by the workers after the purchase and then produced by the manufacturer. Therefore, the accuracy of the wooden door measurement is directly related to the effect after installation. . So, when is the most suitable time for the factory to measure? In simple terms, it should be after the end of the bricklayer construction. At this time, the door hole has been basically shaped, the kitchen and bathroom tiles, and the door stone have been pasted, and the thickness of the wall is basically determined. At this time, the wooden door manufacturers come to measure the most accurate.

Before the measurement, if the original door opening is too wide, you can let the bricklayer build a new wall, or let the woodwork use a light steel keel + gypsum board to close the door hole; if the original door opening is too high, the woodworking light steel keel + gypsum board will be high. The position of the exit is closed; if the original door has one side directly facing the wall without a threshold, the bricklayer can make a threshold, and the woodworker can make a threshold of 3-6 cm.

2 installation time

The installation time of the wooden door is another relatively important time node. Poor handling may cause trouble for the entire decoration process.

The process of installing the wooden door is relatively simple, and the dusty operation is not carried out on the spot, and at most, the hardware is slotted or opened. However, the wooden door itself is easily damaged. According to the principle of finished product protection, the installation time of the wooden door should be relatively backward, preferably after the cabinet and the floor are installed. This is because if the wooden door is installed first and then the cabinet is installed, it is easy to bump into the wooden door of the kitchen when carrying the cabinet material. Many kitchen doors are selected by the owner with glass, which increases the risk of damage to the wooden door during the handling process.

There are different opinions in the industry regarding the order of installation of wooden doors and floors. Some professionals believe that the wooden door should be installed first, because the baseboard of the floor is installed by the floor clerk. If the wooden door is not installed, the floor clerk has no way to install the baseboard connecting the wooden door and the floor. In this way, the floor trader will have to wait for the owner to finish the wooden door and then run for a trip to install the baseboard. Other professionals believe that it is also a good choice to install the floor and then install the door. Because the installation of the floor is very large, it takes dozens of boxes to cover the entire room. If the floor is installed afterwards, it is easy to bump into the wooden door when carrying the floor. In addition, the installation of the floor requires the use of electric drills, hammers, electric planers, chainsaws and other tools, these things are easy to damage the wooden door. In fact, the problem of the baseboard that people are worried about is easy to solve, so that the workers who install the floor should leave more skirting and cut the holes and make the workers who install the wooden door easy to install. [ Follow the WeChat public account "Jiuzhengmen Window Network"; pay attention to courtesy, scan code to send millions of business opportunities! Jiuzhengmen window network exchange group ]

9000 Lbs Electric Winch

9000 Lbs Winch comes with 12 v and 24 v

We have two models for winches in 9000 lbs.

9000 lbs


If you need to get something unstuck, lifted, or loaded, an electric winch can save a ton of back-breaking work.

The hardest part may be deciding which one you need.

Winches are commonly available with either a 12V DC or a 110V AC motor.

For fixed operations, such as a marine railway, a 110V winch works well because it can be plugged into an electrical outlet.

For portable applications or use with a vehicle as the anchor, a 12v Winch is the way to go. These units can be hard-wired into a vehicle or simply hooked up to a battery.

The next consideration is capacity-what weight rating should you look for? As a general rule, take the maximum load that you expect to winch and multiply it by 1.5. The weight rating is based on the first wrap of the cable around the drum. With each layer of cable, the pull capacity actually drops, so when in doubt, go larger.

Always stay well to the side of a working winch, and always drape a heavy jacket or tarp over the line. If a cable breaks, the heavy material will help absorb the energy of the taut cable as it snaps back, and reduce the chance of injury.

If a load outweighs your winch rating, remember those high school physics lessons about pulleys and mechanical advantage. You can double the pulling capacity by [doubling" the line. Run it through a Snatch Block attached to the object you`re moving and then back to a fixed object. Twice the capacity, however, equals half the pulling speed.





small electric winch,electric winch 9000lbs,electric trailer winch

Suzhou DAO Material Technologies Co.,Ltd , https://www.dao-compass.com