1. Check the lifting tools carefully.
2. Before hoisting the electric hoist, it is necessary to accurately grasp the weight of the hoist and do not allow the crane to be overloaded.
3. Before the hoist is hoisted, check the lifting lug strictly. The rope clasp should be tied above the center of gravity of the weight and tied firmly.
4. Before lifting the electric hoist, when the weight of the hoist is at the angle of the angle, the line should be lined before the rope buckle.
5. Before the electric hoist is hoisted, the slip rope should be tied on the lifting heavy object.
6. Before lifting, check the location and force of the anchor to meet the requirements.
18602180016 Meng Jing
2. Before hoisting the electric hoist, it is necessary to accurately grasp the weight of the hoist and do not allow the crane to be overloaded.
3. Before the hoist is hoisted, check the lifting lug strictly. The rope clasp should be tied above the center of gravity of the weight and tied firmly.
4. Before lifting the electric hoist, when the weight of the hoist is at the angle of the angle, the line should be lined before the rope buckle.
5. Before the electric hoist is hoisted, the slip rope should be tied on the lifting heavy object.
6. Before lifting, check the location and force of the anchor to meet the requirements.