In order to reduce the phytotoxicity of pesticides, we must master the safety interval of different pesticides. Xiaobian summarizes the safety intervals of common fungicides and pesticides . Let's take a quick look at it.
Different fungicide safety intervals
1. The pesticides with a safe interval of 7 days include: chlorothalonil, tork, triadimefon, chlorhexidine, and 83 anti-antioxidants.
2. The pesticides with a safe interval of 5 days include: carbendazim, toxic mycelium, thiophanate, methyl thiophanate, anti-virus cockroach, and pulic.
3, the safety interval of 15 days of pesticides are: Daisen zinc, Daisen manganese zinc, enemy force off, Suo Keling, ethyl aluminum phosphate, Wanmuling, Kelu, Dasheng, Lei Duomei, green milk copper.
Different pesticide safety intervals
1. The pesticides with a safe interval of 11 days are: èšœé’çµ, malathion, chlorpyrifos, diazinon.
2, the safety interval of 5 days of pesticides are: 虱蚜 虱蚜 (蚜虱 ã€, imidacloprid), ruthenium, dichlorvos, fenvalerate, cypermethrin, chlorpyrifos, phoxim.
3, the safety interval of 7 days of pesticides are: enemy killing, verbacel, fast killing Ding, trichlorfon, Baofa No.1, Kangwei, Le Siben, agricultural land, insects, music, music Fruit, cyanidin, chlorpyrifos, mazonic, cadherin, Qiqisu (worm cock, Haizheng worm, insect mites).
4. The pesticides with a safety interval of 24 days are: chlorpyrifos, bataan, quetiapine.
5. Pesticides with a safety interval of 15 days are: Krut and Klein.
6. The pesticides with a safety interval of 30 days are: Amitraz.
More pesticide knowledge, please pay attention to China Pesticide Network
1.Application : For sport equipment
2.Dimension: Customized dimension, OEM & ODM
3.Material: A6063, A6061, A3003 and other series alu alloy
4.Suface treatment: Anodizing, polishing, turning ,power coating, mill finish etc
5.Equipment: CNC ,extruding machine, cold drawn machine, heating oven, straightening machine, cutting machine
OD |
OD Tolerance |
ID Tolerance |
Roundness |
Straightness |
Circular run-out |
φ16-20 |
±0.02 |
±0.02 |
0.01↓ |
0.015↓ |
0.05↓ |
φ20-30 |
±0.02 |
±0.02 |
0.01↓ |
0.015↓ |
0.05↓ |
φ30-50 |
±0.05 |
±0.05 |
0.02↓ |
0.020↓ |
0.08↓ |
φ50-80 |
±0.15 |
±0.10 |
0.05↓ |
0.025↓ |
0.10↓ |
6. STANDARD PACKING:Wooden case/carton
7. Trade Terms
1. Payment: 30% T/T in advance, 70% balance pay before delivery. L/C at sight.
2. Delivery time: 20 days after deposit receiverd. If opening mould, plus 7-10 days.
3. Trade Term can be chosen depending on your requirements.
4. FOB Port: Shanghai
Drawn Tube For Sports Equipment
Drawn Tube For Sports Equipment,Aluminum Drawn Tube For Sports,Sports Aluminum Drawn Tube,Drawn Tube For Sports Parts
Changzhou YiFei Machinery Co., Ltd. , https://www.yifeialu.com