Renovation of new homes is a major event at home, and they want to decorate new homes more beautifully, and are afraid to find unsuitable engineering teams to be pitted. Therefore, the choices before the renovations are started are so many owners are very tangled, in fact, as long as they have some relevant House renovation steps and precautions, new home renovation will not be so difficult. Xiao Bian today to everyone ready to introduce the decoration steps, such a detailed house renovation steps only in this site Oh!
So detailed house decoration steps , preparatory work
1. Familiar with the drawings, communicate with the designer in a timely manner, provide reasonable suggestions for the designer's plan, and use the materials to achieve the task of saving material and labor. Comprehend the designer's design ideas and have a clear understanding of the program.
2. Be familiar with the owner and have a detailed understanding of the owner's daily schedule, personal preferences, family members, cultural level, and professional knowledge. Keep the owner's contact information and current address in order to facilitate communication with the company and the project manager. Coordination and cooperation enable smoother work.
3, Familiar with the foreman, have a sufficient understanding of the ability of the foreman, and do a good job of communication and corresponding guidance.
Tips: do not underestimate the design program, a good design, allows you to decorate not only save money and less detours Oh!
So detailed house decoration steps two, approach preparation
Prepare images and engineering materials. Entry certificate: construction permit, number plate; secretary tool: pen, book; package door tools: door cover, scissors, transparent plastic; measurement and positioning tools: spirit level, tape measure, chalk; site layout tools: image card, ruler card, Shantou, line cards, nails, etc.; Sanitary appliances: brooms, shovels, garbage bags.
So detailed house renovation step three, approach construction
(A) The water electrician enters the field
1. The water and power supply enters the market and is delivered in the morning.
A. At the same time, the designers, project managers, plumbers, supervisors, and owners of the five parties were present at the scene and witnessed the start of construction.
B. The designer guides the plumber to carry out the positioning, including the location of the switch socket, the quantity, the purpose, etc., and explains the elements of the home room type. The plumber marks the wall with chalk.
C. The plumbers are purchased by the owners. For example, the company is responsible for the procurement of the entire package, and the plumber is responsible for explaining the matters needing attention. In the afternoon, the materials must be officially opened for the convenience of the plumber.
D. The level or vertical line is positioned by the designer or supervisor using the spirit level, and the "unified level switch" and "leveling line" are posted. This line is only used for reference and construction of the site image, not afraid of practical significance, construction workers in all processes to their own measurement results prevail.
E. The on-site project manager will protect the finished product door and other objects and post protective plastic. Hang the image cards on the wall and post good construction instructions, project progress, contact details of each person in charge, staff guidelines, etc. on the image cards.
F. Advertise and promote advertisements, pictures, and other features prominently in the customer's home.
G. Remind customers to choose ceramics, tiles and other materials as soon as possible to facilitate the construction of bricklayers and reduce the preparation time for the early stage.
2. The construction of the plumber entering the site (about 3 days, and appointment of water release and water pipe)
A. Slot on the first day, and slot the wall positioned on the previous day to facilitate the laying of the line pipe. Before the slotting, use the spirit level line to horizontally and horizontally, and the groove depth should exceed 1 cm above the diameter of the line pipe.
B. Row the second day of the day, pre-arrange the required pipelines, and re-grooving the pipelines in a staggered place to ensure that there is only one pipeline at the ground level, so that the pipelines will not be squeezed with each other, and the appearance will be guaranteed. .
C, threading on the third day, put the wires in order. And before the grooved place is cemented with cement mortar, and then the line pipe is densely arranged in place with a cement mortar to reinforce it so that the sand and cement on the mud tile will not damage the pipeline.
D. Clean up the garbage and place it in the designated location before leaving.
3, hydropower process quality inspection (1 day)
A. The water pipe supplier pressures the water pipe, detects the pressure of the water pipe, and checks whether the water pipe leaks or not. A pressure drop of 15 minutes is normal and there is a problem when the pressure drops. After the pressure is over, a warranty must be issued to clarify the responsibility.
B. The supervisor checks whether the direction of hydropower is horizontal and vertical, whether the diameter of the wire can meet the power of the electrical appliances used (such as: whether the air-conditioning inlet is a 4mm line), whether the wire in the wire tube is pulled or not, and whether the use of the yellow wax tube is reasonable or not. Whether the wire is connected or not, and whether the bare wire is wrapped with electrical tape and neatly placed in the bottom box.
C. Invite the owner to inspect the hydropower to check the conditions of the hydropower construction and the contractual agreement. Reasonable recommendations should be satisfied or changed, and unreasonable requirements should be interpreted.
D. Present the water and electricity acceptance form to the owner and ask the owner to sign and sign the water circuit after signing.
E. Inform sand, cement supplier Shangsha and cement, according to the size and size of the tiles, and the size of the leveling to put sand and cement, sand, cement do not pay the money to sign, after enough money to pay the bill.
(b) Waterproof approach (1 day)
1, waterproof to achieve the specified location (height), the balcony side of the water pipe also have to do.
2. Inform ceramics, sanitary ware (squat toilets, water tanks, floor drains) for delivery, ceramics classification code put neatly, signed and accepted by the owner, and all packages are checked by the supervisor.
(C), masonry workers enter the field (depending on the size of the house and the ceramic laying amount of a fixed period)
1, the scene on the mason to make the bottom, the laying of ceramic rules, methods to their bottom, leveling the thickness of the bottom.
2, first paste the kitchen wall tiles or balcony floor tiles, the toilet water testing, and in 24 hours after the property to find the key to open the door downstairs to see the waterproof effect.
3, so that the water pipe into the field of water, the water pipe package method requires the guidance of mud tiles, to facilitate the laying of clay ceramics, and ensure the appearance of ceramics.
4. The inspection of masonry tiles is to check whether the laying at the corners is smooth, whether there is any misalignment, whether the edge and the edge are smooth, whether there is a sense of step, and whether the caulking is handled and cleaned up. When leveling the air bubble, it can be smoothed, and whether the toilet or balcony floor drain tilt can be smooth and free flowing.
5. The sanitary waste can be left after being bagged and stored at the designated place.
6. The owner is requested to check the masonry project and sign it on the masonry completion acceptance form. And inform the owner to buy cabinets, doors, etc., make good orders, and go to the company to choose the color of the panel.
(D), woodworking approach
1, woodworking approach (1 day)
A. Carpenters enter the market to make the bottom. The shape, height of the ceiling, and the style of the shoe, wardrobe, and background wall are matched.
B. Carpentry blanking, and inform the plate supplier delivery.
C. Protect the finished product, lay protective foam on the ceramic, and lay carpet on the floor in the woodworking room.
2. Woodworking approach construction. (The duration depends on the amount of work)
3. Woodworking quality inspection
A. Both horizontal and vertical, woodworking must be straight.
B. When the door is opened, the action is light and there is no abnormal noise.
C. Touch the burr anywhere in the hand and smooth it.
D. The seams are smooth and no obvious splicing sensation.
E. If there are no special requirements on the design, the corner must be 90 degrees.
F. Sanitary cleaning, bagging to the designated location can only leave.
4. Inviting customers to enter the market for inspection, because woodworking is difficult to make changes after a good job, as long as the design requirements and standards are not changed. Ask the customer to sign on the woodwork acceptance form to confirm the preparation of the next process.
(five), painter approach
1. The painter blanks and informs the paint supplier of the delivery. (1 day)
2, the painter first caulking, after affixed kraft paper, scraping putty. Putty to scrape twice, wait for dry after grinding, and then scrape paint twice.
3, wood first caulking, after the paint.
4, paint quality inspection
A. Whether the wall, top, etc. are flat or not.
B. Whether the latex paint is fully covered or not.
C. Whether the woodware is shiny or not, there is no convex and concave feeling at the gun nails.
D, whether the panel is smooth
5. Invite the owner to check the paint work and sign it for confirmation. Painters can only leave after cleaning.
(VI) Finished product installation
1. Inform the door, cabinet, wardrobe and other finished products to enter and install.
2. Electricians install non-main lights such as switches and spotlights.
3. Arrange home cleaning and remove all construction waste.
So detailed house renovation steps four, total acceptance, delivery
1. Invite the owner to check the house as a whole and sign it for confirmation.
2, camera archives, can be used for publicity.
3, require the owner to settle the balance.
4, the construction party issued a warranty.
House decoration considerations
1, the overall budget to consider
Determine the budget of the decoration material. First of all, family members must agree on the basic content of house decoration, such as what to do without furniture, what materials are on the ground floor, and what the functions of each room are. And then to the major decorative markets to make a map, after grasping the general market price of various materials, the proposal may wish to sit down to discuss the whole family, to understand the above materials, brand, material, origin, performance, price and other aspects, is conducive to It is very easy to talk with a professional decoration company, and it is possible to make a preliminary budget based on the primary situation in hand so that the renovation projects can be reasonably arranged and the corresponding funds can be prepared.
Make a budget for the renovation project. Consumers should have a plan of a new house on their hands. The house decoration should set the living and use requirements and facilities requirements for the living room, bedroom, study room, dining room, kitchen and toilet on the drawings, and list the list of projects to be done. Based on the price parameters provided by the decoration market, an estimate of the previous period is drawn.
Different grades of decoration, different budgets. House decoration is a comprehensive project. It has many unknown factors and different grades. It needs to give the decoration company a layout and planning time (about one week) so that a set of suitability can be determined according to different decoration grades. Program and budget. If the decoration is simple, a special understanding of basic materials such as wooden floors, latex paints, tiles, and plywood will be carried out. The calculated price is basically the main subject of the total cost; if it is a high-grade decoration, besides the basic items, it will remain. There is room for designers to embellish aesthetics.
2. Rationally allocate budget funds
Decoration, decoration - light weight. "Re-decoration and light decoration" will gradually form a trend, because the decoration means are limited, can not meet the design requirements of personalized home, and different styles, styles and diverse home accessories, but it can be derived from numerous home style. Therefore, many people only require high-quality “four whites†when decorating, and at the same time, they use decorative methods to shape their home. Therefore, most of the budgetary funds should be invested in decoration.
Customer, bedroom - which is important. There are more and more forms of "little bedroom". You may wish to invest more in the living room and spend less on the decoration of the bedroom. The most important thing is to decorate the living room to reflect the characteristics of this family. The treatment of the roof, wall, and floor is not only of high quality and material quality, but also novel in decoration techniques. In the allocation of furniture and accessories, the share of the living room should be the largest in the overall budget. Contrary to this, the decoration and decoration of the bedroom is based on simplicity and warmth, which need not be too sculpted.
Top, wall, ground - treat differently. The net height of the home room is generally low, about 2.5-2.8 meters. In order not to create a sense of depression, the top of the room is simple and appropriate. The decoration of the wall is also simple and appropriate, which not only saves money, but also has wonderful results. The decoration of the ground requires a lot of effort. The texture and color of the floor decoration material determine the decoration style of the room, and the use frequency of the ground is obviously higher than that of the wall and the ceiling. In terms of floor materials, composite wood flooring with excellent texture and decorative effect is more suitable for home use.
Kitchen, bathroom - work hard. The kitchen is the place with the most pipelines in the home, and it is also the most troublesome when it comes to decoration. It is worthwhile to invest more money to make the kitchen beautiful. The whole kitchen furniture market is gradually optimistic. This is the new trend of the "kitchen revolution". The decoration of the bathroom has the same problem, because many bathrooms are poor in ventilation and lighting, so it is necessary to make more efforts in the renovation.
3, audit budget can not be ignored
Review drawings must be accurate. When reviewing the budget, you should first review the drawings. A complete set of detailed and accurate drawings is the basis for the budget quotations, because the quotations are based on the specific dimensions, materials and technological conditions in the drawings. If the drawings are inaccurate, the budget is certainly not accurate.
The project should be complete. Check whether all the projects in the budget are complete, and see if everything you have to do is listed on the budget statement. Is there any underreporting? When these missing projects arrive at the site, they must be done, but it will inevitably be necessary. To increase the number of formalities, increase an unexpected amount of expenses.
The unit of measurement looks real. In the production of furniture, each decoration company differs greatly. For example, a large wardrobe or a bookcase is used. Some companies use "Yanmi", and some use "square meters." This time, they should pay special attention because they often press "square meters." Regardless of how high the calculated furniture is, the actual number of square meters multiplied by the unit price is used to calculate, and the furniture calculated using “Yanmi†is highly limited.
Xiao Bian summary: The above is such a detailed description of the house decoration steps and precautions related to the decoration process will have a big purchase process, so the necessary documents must be kept when buying things, so that can guarantee the late retirement may exist The exchange of goods and other situations are easier to deal with. In particular, some important items such as shopping tickets and manuals, etc., because many things have a warranty period, the loss of certificates would be more troublesome. Even if you can't even make you spend a lot of money, that's really not worth it. If you want to decorate in the near future, you can call our customer service phone number, and there is free room service waiting for you!
Home Improvement Precautions Renovation Steps Home Renovation Precautions Decoration Precautions House Decoration Renderings
3M Measuring Tape,Waterproof Tape Measure,Stainless Steel Tape Measure,Plastic Tape Measure
SHANGQIU CHAOYUE MEASURING TOOLS CO., LTD , https://www.equipmentool.com