What are the precautions for hydropower acceptance?

When decorating a room, we tend to overlook many details, which leads to more and more troubles in the later period, especially in the field of water and electricity. As a separate project in home improvement, every link of pipes and wires is not tolerated Ignored, as we all know, hydropower projects are closely related to our lives, so when conducting house acceptance, we must ensure that hydropower acceptance is also in place, so what are the precautions for hydropower acceptance ? Let ’s take a look.

Matters needing attention in water and electricity acceptance: waterway

1. Water is a very important existence in our lives, so the acceptance of waterways should not be underestimated, especially for newly installed water pipelines, it must be tested under pressure, and at least 8 hours of closed irrigation should be passed during the test In the tube pressure test, maintain the water pressure at least 9KG. If decompression occurs, it means there is a leak.

2. In order to increase the aesthetics, many users will conceal the water pipes. These must be checked for water flow, and the original pipes must be temporarily sealed before construction to avoid falling into the sundries. In addition, the installation pipe diameter is less than 25mm For water supply pipes, pipe clamps should be installed at 100mm of the pipe corner, water meter, faucet or angle valve, and pipe terminal, and the pipe clamp must be firmly installed.

3. All the joints and contact points of the water pipe must be tight, and there must be no leakage. In addition, the pipe should also have a certain slope. It is recommended to wipe all joints, valves and pipe connections with water while using paper towels to check Check whether the water is leaking. In addition, do not install the water pipe near the power supply. The distance between the water pipe and the gas pipe should not be less than 50mm.

Matters needing attention in hydropower acceptance: circuit

1. Nowadays, there are more and more electrical equipment in the home, and these are inseparable from the use of electricity. During the acceptance, it is necessary to pay attention to check whether the strong wire pipe is walking on the wall, whether the weak wire pipe is walking on the ground, or the ground is strong. The weak wire pipe runs on the ground, etc., and whether there is a separation of more than 300mm between the two wires. In addition, the water pipe should go along the wall as much as possible, and the wire groove should be kept horizontal and vertical.

2. When laying the pipeline, make sure that all lines can enter the pipe, and the pipe joint must not be saved. When installing the power socket, you should remember the left zero line and the right phase (fire) line, and the top is the ground line. In principle, at the same time, ensure that the live wire enters the switch and the zero wire enters the lamp head.

3. Products used in toilets must have a splash plate to avoid moisture and moisture from entering. Generally speaking, the power socket is 300mm from the ground and the switch is 1400mm from the ground, unless there are special needs, for example Wall-mounted air-conditioning socket.

Summary: Ok, the above is the introduction of the precautions for hydropower acceptance . I hope to provide you with some help. I believe that in the future selection process of hydropower acceptance, friends will be more handy and buy their own satisfactory products.

What, the decoration still uses his own money? ! The Qi family is decorated in installments, with an ultra-low annual interest rate of 3.55% and a maximum loan of 1 million. Apply now to enjoy the discount

LED Batten Light

Led Batten Light,Waterproof Led High Bay Light,Led High Bay Light,Led High Bay Lights

JIANGMEN MOSCOT OPTOELECTRONIC TECHNOLOGY CO.,LTD. , https://www.zjsensorsled.com