For those who haven't experienced the renovation of the house, if they want to get all of their own decoration materials, design the renderings, and then carry out the construction, such a large project cannot be imagined. The following small series introduces the decoration steps for the rough house .
Blank room renovation steps
1, for the overall measurement of the rough room and the main demolition
Determine the size of the area and the size of the wall in the decoration process. For tiled areas, wall paints, etc., you need to prepare in advance, and then the main demolition reform, including the demolition of the wall, shovel wall, change steel window and so on. The rubbish removed must be cleared in time to facilitate future construction.
2. Start hydropower reform
Before the hydropower reform, we must determine the location of the lamps and sockets; when we slot the hydropower, the strong electricity is tied with the weak electricity, and the lights on the top must be clearly bound, and there are others. For the air conditioning hole and the power is best placed on the wall of the bed to avoid blowing air directly after the person.
3, tiling began
When preparing for tiling, you must choose a floor drain, and you must select a floor drain. You must select a dedicated floor drain so that you can effectively prevent odors. After you finish waterproofing and brushing, you can prepare a tile.
4, install the floor
Level the floor before installing the floor so that the floor is level and flat.
5, the whole room as a whole installation
The overall installation includes: lamps, sanitary ware, door locks and cabinets, etc. These can be carried out at the same time as the paint. These installations are not good and will affect the appearance. Therefore, great attention must be paid to the installation.
Blank room inspection room matters needing attention
1, the balcony, rain cover and other exterior parts must be carefully checked.
2. Electrical equipment and public equipment need to be inspected.
3, all kinds of pipeline test pressure, water, heating inspection.
4. Various types of doors can be checked with prefabricated floor or cast-in-place ceilings.
5, the room with waterproof requirements must be strictly in accordance with the waterproof layer, protective layer requirements to plan, acceptance can be carried out two water storage test, so that no leakage.
6, water acceptance including kitchen, bathroom. Bathrooms include floor drains, toilet water pipes, water pipes under the toilets, and sewage pipes in wash basins. Check if there are any problems during acceptance. Problems can be changed. The reform plan must listen to the opinions of experts.
Editor's summary: About the rough room renovation steps introduced here and hope to be helpful to everyone. Want to learn more related knowledge can focus on this site information.
Decoration Steps Decoration Steps & Budgets Blank Room Decoration Steps
Siemens SMT Feeder Units are specially designed for Siemens SMT Machine use. Siemens SMT feeders have the D type and the X type series. These types of feeder series are applicable and uniquely design for different Siemens pick and place machine models. Our company can provide all types of Siemens SMT Feeder units. For inquiries, please contact us or you can also visit our official website to learn more about Siemens feeder products.
Siemens Feeder,Siemens Tape Feeder,Siemens Tape Feeder Module,Siemens Feeder Parts
ShenZhen KDW Electronics Co.,Ltd , https://www.smtsplicetape.com