Home renovation of the groundwork should be considered the basis for home improvement. Many people do not understand the acceptance of ground engineering. In fact, there are many types of ground engineering. At present, there are two types of floor ground and wooden floor.
Acceptance plate ground first depends on whether the type of plate in the surface layer (the surface layer that can be seen) meets the design requirements.
The surface layer and the base layer should be firmly bonded without hollowing. Hollowing is a common disease in the project. Simply speaking, there is an air gap between the surface loading and unloading material and the base layer, which leads to structural problems. The method of checking this problem is relatively simple. To find a small hammer, tap it, listen to the sound, and empty the drum if the voice is empty.
Secondly, it is necessary to check that the surface of the plate should be clean, the pattern is clear, the color and luster are uniform, the interface is uniform, the periphery is straight, and there is no phenomenon of cracks and defects;
Third, the floor slope of kitchen toilets must meet the design requirements, and must not be flooded or accumulated water.
Fourth, the laying surface of the baseboard should be clean, the joints should be even and even, and the joints should be firm. The thickness of the wall should be suitable. A hammer can be used to tap;
5. The material and dimensions of the edging (copper wire, etc.) adjacent to the surface meet the design requirements, and the corners are neat and smooth;
Sixth, using a 2 meter ruler to check the surface flatness, the allowable deviation of the marble plate is 1 mm, and the allowable deviation of the whole body brick is 2 mm;
Pull 5 meters to check the seam line. The allowable deviation of straightness is 2mm. The marble is 3mm. The baseboard is straight. The allowable deviation is 1mm. The bricks are 3mm. The width of the plate gap is not more than marble. 1 mm, brick body not more than 2 mm;
Check the woody ground mainly to see the following points:
First, wood joists, wool floors, and stumps must be treated with anti-corrosion treatment. The installation must be firm and straight. The spacing meets the design requirements and the foot can be checked;
Second, the wood surface must be nailed firmly without loosening, no hollowing, and can be tapped with a small hammer to check;
Thirdly, the surface layer of the wood is polished and polished, with no scars, blemishes, and furrows. The pattern is clear, the gap is tight, and the joint is staggered and glued without overflow;
Fourth, the wooden skirting seam tightly smooth surface, the thickness of the wall is the same;
Fifth, use a 2-meter ruler to check the surface flatness, allowing a deviation of 2 mm.
Pull the surface of the 5 meter line to allow the seam straightness to be allowed to deviate by 3 mm, the allowable deviation of the straight line on the baseboard line is 3 mm, and the gap width is not more than 0.5 mm.
Villa design entrance decoration marble decoration design home decoration home improvement floor tile

What should be paid attention to when checking the bathroom?

Full-decoration room quality difficult to guarantee acceptance "seven see"
Home renovation of the groundwork should be considered the basis for home improvement. Many people do not understand the acceptance of ground engineering. In fact, there are many types of ground engineering. At present, there are two types of floor ground and wooden floor.
There are many types of ground engineering. At present, there are two types of ground and wooden flooring. Acceptance plate ground first depends on whether the type of plate in the surface layer (the surface layer that can be seen) meets the design requirements. The surface layer and the base layer should be firmly bonded without hollowing. Hollowing is a common disease in the project, simply speaking, ... 80 after the small husband marriage house petty marriage room mood fashion embodiment of a member exclusive cash discount Mediterranean style blue + white mosaic even ...
Applicable to the existing advanced terrazzo and broken pieces of marble engineering.
Applicable to the existing advanced terrazzo and broken pieces of marble engineering. (1) Ensure that the materials, strength (combination ratio) and density of the various surface layers of the project are to comply with the requirements of the design requirements and the construction specifications. The surface layer is firmly bonded to the grass roots. Test method: Tap with a small hammer to check. (2) The overall ground surface of the basic project...80 couples wedding room, petty bourgeois marriage room mood fashion embodiment, a member of the exclusive cash discount, Mediterranean style blue + white mosaic...
Ground Engineering Acceptance Specification 2.1 Marble Ground A, process flow test code number - grassroots repair - find the level, line - paving - inlaid copper - Sew - clean - maintenance. B, construction preparation 1), familiar with the design drawings, according to the drawings to understand the size of each part and practice, to clarify the relationship between the colors of the pattern. 2) According to the design drawings, to the site of the construction site to measure, and in combination with the actual situation, drawing blocks block diagram. ...
submit
Aquarium Lamp,Aquarium Bulb,T8 Coral Tube,T8 Coral Bulb
Changxing leboom lighting product CO.Ltd. , https://www.leboomuvs.com