Tri-roller brakes before use

Usually, the three-roll gate shall be debugged before use to prepare for normal use, such as:

Three roller gate

1) Left and right definition: In the face of a three-roll gate, the three-roll gate brake lever rotates clockwise to the left, and the three-roll gate brake lever rotates counterclockwise to the right;

2) Three roller gate input interface: +12V level signal or DC12V pulse signal with pulse width >100ms, drive current >10mA or dry contact signal or RS485 signal;

3) Connection of the terminal block: Connect the power supply and the opening signal according to the identification of the terminal block;

Normally there are 3 ways to connect the three roller gate opening signals:

A、Three roller gate dry contact signal: VDD is common, OPE-L and OPE-R are respectively short-circuited to VDD and left open and right open signals respectively;

B, +12V level signal or DC12V pulse signal: GND is common, and OPE-L and OPE-R form high and low level circuits respectively with GND. They are left open and right open signals respectively (Note: High level is connected. OPE-L or OPE-R);

C, RS485 signal: TA, TB are A+, B- respectively, GND is public land.

4) Three-roller brake single-direction free-pass adjustment: Adjust the solenoid nut's stroke nut to open the positioning arm, which can make the gate machine free-flow in one direction.

Among them, the three-roll gate adjustment positioning nut must be fixed firmly to prevent loosening.

Aluminum Sheet With Marble Color

Aluminium Flat Sheet,Polished Aluminum Sheet,Perforated Aluminum Sheet,Decorative Aluminium Sheet

SHAOXING YOTO IMPORT&EXPORT CO., LTD , https://www.sxyoto.com