Most people choose to avoid the winter decoration, but this is a long-established form of thinking. With the improvement of material manufacturing and construction levels, many raw materials have been able to adapt to the weather requirements of winter decoration. As long as you pay more attention to the common problems of winter decoration, you can ensure the smooth completion of home improvement.
Mona Lisa Tiles
How to ensure the smooth completion of home improvement in winter
During the construction of winter decoration, in response to the influence of temperature and humidity on materials and processes to varying degrees, the decoration company shall require the installation of humidification and heating equipment at the site, and construction shall be conducted only after sealing for three days under constant temperature and humidity conditions.
Before using the decorative panel, use a dry towel to wipe off the dust and apply the varnish back to the bottom twice. All decorative panels should be laid flat. A large core board is placed on the bottom and a large core board is pressed on the top to prevent cracking and warping.
The wall care time is best chosen between 10 am and 4 pm, during which the temperature is relatively high, which can prevent the newly approved putty from freezing. Every time a new batch of putty needs to wait until the last time the putty is completely dry, it can be continued construction and then sanded carefully.
When the gypsum board ceiling operation is performed, the moisture content of the wood keel must be controlled below 12%, and the keel must not show any signs of loosening, so that cracks in the gypsum board ceiling can be prevented. Gap between the gypsum board, gypsum board and wall surface should be about 0.5 cm. Gypsum powder and latex should be used to reconcile the gaps. Then double kraft paper and putty are added to prevent plaster. Cracked board.
Large wind and sand in winter, when the paint and paint are dry, it is easy to attach dust, so when it comes to strong wind and dust, it is not suitable for paint work. Ensure that the ambient temperature of the paint used is not less than 5 degrees Celsius, and the ambient temperature when the varnish is applied is not less than 8 degrees Celsius. When the paint is dry, it is necessary to close the doors and windows to prevent the sand from destroying the paint.
When decorating, the gap between doors and windows should not be too small, so as not to open in the summer, close the doors and windows. Similarly, paving solid wood flooring, furniture, etc. must leave some room to reduce the impact of seasonal temperature on wood products.
Tiles and tiles must be treated with water soaking before construction to make the water reach saturation. In this way, the emptying and shedding phenomenon will not occur due to the lack of adhesion of cement due to the suction water, and the brick must be checked in time after paving. Sew.
The timely ventilation of the site must be ensured during construction. This not only affects the drying speed of paint materials, but also relates to the pollution of the construction site. At the same time, after the renovation is completed, at least one week of ventilation is required to ensure the safety and health of the living environment.
The most appealing aspect of winter decoration is that all types of building materials brands will have substantial discount pricing activities at the end of the year, and can save a large amount of renovation costs on the budget. The decoration market in winter is relatively sluggish. The decoration company will pay the greatest attention and the service will be in place.
It should be noted that in winter construction, home improvement companies with professional management must be selected. Only a good management system can prevent construction delays. Of course, it can often be used as a “supervisory worker†at the construction site, which not only serves as a supervisor, but also fully enjoys the excitement of seeing the new home showing beauty every day. Of course, professional work such as material process management is still a task for professional supervision to supervise and inspect. So please forget that winter is the way to decorate the restricted area.
Renovation experience Entrance decoration Children's room Decoration paint Home decorating decoration Company decoration Looking for fit-out company How do you do? Cost of renovation Floor tile Tile Tile Floor tile ld Tile
Gate Valve,Sluice Valve,Knife Gate Valve,Slide Gate Valve
LIANGGONG VALVE GROUP CO.,LTD , https://www.lgvalvegroup.com