After the signing of the contract, the renovation began to enter the substantive construction phase. You can see that your house is undergoing new changes every day. At this time, it is significantly more relevant to deal with the construction team. Appropriate understanding of some of their work responsibilities, responsibilities and clear work efficiency is not high, and will not be pushed back to unable to solve problems in a timely manner.
Dream Flame Fireplace
Construction Team: At present, home decoration engineering construction on the Beijing home improvement market comes from many provinces and regions, such as Anhui, Jiangsu, Jiangxi, Hubei, Zhejiang, etc., and the skills of personnel in each region are not the same.
Foreman: The foreman on the home improvement site is the contractor we mentioned in the past few years. However, after the development of the past few years, many of the rustic contractors in their heads have changed their hands and become handshaking. The small boss of the mobile phone also has a great leap forward with the previous years.
Project supervision: Project supervision is the person who manages the quality of the project and the progress of the project that flashes in our minds. Some of these people are college students who entered the industry after graduating from university, some are skilled workers or technicians from big construction companies, and others are themselves Most of the foreign workers working in the construction team have certain construction management experience and certain construction skills. It should be noted that the project supervision mentioned here does not distinguish between the decoration company's own engineering quality inspectors and the supervision company's full-time supervision personnel. However, actually there is a big difference between them. The former actually speaking strictly speaking, should be called "quality inspectors"; the latter is the real sense of engineering supervision.
Changes in the project: The construction projects and specific practices discussed in the home improvement process may change during the construction process. This change is called project change. There may be many reasons for the change, perhaps because Party A wishes to change, perhaps because Party B intends to change. However, any direction that wants to make changes to the project must be approved by the other party.
Project additions: Project additions generally refer to items not included in the original contract. The construction process may be due to an increase in the number of owners who want to increase the number of projects.
Links: Keeping in mind the need of home furnishing for young home renovations
Construction Acceptance Home Furnishing Home Decor Home Decor Home Decor Home Feng Shui Home Decor Feng Shui Fire Home Home Decor Home Decor
For different application scenarios of customers, our R&D department independently designed and developed a variety of Peristaltic Pump heads with different sizes, different appearances, different flow rates, and different types. Support the customization of the number of pump head rollers and the installation shaft. It can be used with the customer's motor and drive. The Peristaltic Pump Head of the peristaltic pump can be customized with different pump head connection brackets and so on according to the needs of customers.
The pump head of the peristaltic pump can be purchased separately or together with our driver or motor.
Different Peristaltic Pump Head has a different flow rate.
The liquid filling of the Peristaltic Pump Head only passes through the hose, does not touch the pump body, and has no valves or seals and other connecting parts. Routine maintenance only requires regular replacement of the hose, which reduces the maintenance cost of the user.
Micro Flow Pump Head,Multichannel Pump Head,Industrial Pump Head,Peristaltic Pump Heads
Baoding Chuangrui Precision Pump Co., Ltd. , https://www.chuangruipump.com